is not possible to make a preliminary estimate of the Lower
site dam.
4.
We asked Mr. Binnie if the visit could be satisfactorily
made provided the additional information he requires was available
when he reached Hong Kong, but he thought it would be necessary for
him to examine the data in England before leaving, and we think
this is the proper course to take. The Consulting Engineers
proposed charge for the preliminary visit, report and advice on
the general scheme is £3,000. plus travelling, hotel, and out-of-
pocket expenses, and it would be unfortunate if the visit was
made at too early a date and a second visit became necessary.
believe that when the scheme for the Gorge Dam was first considered
it was necessary for the Consulting Engineers to make two
preliminary visits owing to the data available when the first visit
was made being inadequate.
5.
We
The Consulting Engineers indicate in their letter the
additional information required, and it would be an advantage if
we could be advised in advance when this information will be
advailable, in order that we can reserve a passage on Imperial
Airways for Mr. Binnie.
I have the honour to be,
Sir,
Your obedient Servant,
25. Amfield
for Crown Agents.